Skip to main content

Search the Special Collections and Archives Portal

upr000338 55

Image

File
Download upr000338-055.tif (image/tiff; 25.83 MB)

Information

Digital ID

upr000338-055
Details

Rights

This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

Digital Provenance

Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

Publisher

University of Nevada, Las Vegas. Libraries

V Mr. B. L* Adamson, Sheet Bo* 21. Labor Matl Total 220 ft* 3* pipe 824*3 f t . 2§* * 84*0 " i f " • 43.5 * I f " ? and fittin g s complete in p la ce , $114.84 $218*41 $333*25 (16) There i s , unquestionably, more piping charged to th is work order than was necessary to supply the 5 pens constructed under Work Order 1657, but as no record is found covering the retirement o f this piping, it is included in this study. Work Order 1775. completed in June 1917 Installed S*H* wood tank opposite Station 0+90, track #17, and replacing pipe lin e serving stock pens now shewn as #1 to 12 in cl* and 25 to 31 in cl* S.H. 30,000 gal* wood stave water tank with 11' frame foundation, ea. 1 $143*81 $501*33 Pipe lin e in stalled 390 f t . o f 4 " S.H* pipe 245 " » 2§" " ** 210 - " 2|* Std. S.H. pipe 26 * « 6 " new casing pipe 24 " " 3" new pipe and a l l fittin g s couplets, 36*58 368*43 fip e lin e released 570 f t . o f I f " 210 * • 2§" ________ a *15 $989*02 (16) Work Order 6823 was completed May 27, 1927, and covers replacing the above 30,000 gallon tank with one o f 40,000 gallon capaoity*Tha^ accounting therefor has not yet been completed so that it is not possible to include the ledger value o f the 40,000 gallon tank in this study* Work Order 4121. completed January 31. 1923 Installation o f water line from tank located 76*5* right o f 0+90 track #17 through stock pens #39 and 40, then southerly to the center o f stock pen #74* i f " std . p ip e, lin e conplete with a ll fitt in g s , lin .ft * 50 $ 5*33 $ 19.96 2" std . pipe, lin e complete with a ll fitt in g s , lin . f t . 180 7.40 27.71 3** std . pipe, lin e conplete with a l l fit t in g s , l i n . f t . 450 38.09 142.58 6* std . pipe, lin e conplete with a ll fittin g s , l i n . f t . 412 155*32 581.49 Interest during construction, 8.16 #986*04 (16)