Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Information
Digital ID
Permalink
Details
Member of
More Info
Rights
Digital Provenance
Publisher
Transcription
V Mr. B. L* Adamson, Sheet Bo* 21. Labor Matl Total 220 ft* 3* pipe 824*3 f t . 2§* * 84*0 " i f " • 43.5 * I f " ? and fittin g s complete in p la ce , $114.84 $218*41 $333*25 (16) There i s , unquestionably, more piping charged to th is work order than was necessary to supply the 5 pens constructed under Work Order 1657, but as no record is found covering the retirement o f this piping, it is included in this study. Work Order 1775. completed in June 1917 Installed S*H* wood tank opposite Station 0+90, track #17, and replacing pipe lin e serving stock pens now shewn as #1 to 12 in cl* and 25 to 31 in cl* S.H. 30,000 gal* wood stave water tank with 11' frame foundation, ea. 1 $143*81 $501*33 Pipe lin e in stalled 390 f t . o f 4 " S.H* pipe 245 " » 2§" " ** 210 - " 2|* Std. S.H. pipe 26 * « 6 " new casing pipe 24 " " 3" new pipe and a l l fittin g s couplets, 36*58 368*43 fip e lin e released 570 f t . o f I f " 210 * • 2§" ________ a *15 $989*02 (16) Work Order 6823 was completed May 27, 1927, and covers replacing the above 30,000 gallon tank with one o f 40,000 gallon capaoity*Tha^ accounting therefor has not yet been completed so that it is not possible to include the ledger value o f the 40,000 gallon tank in this study* Work Order 4121. completed January 31. 1923 Installation o f water line from tank located 76*5* right o f 0+90 track #17 through stock pens #39 and 40, then southerly to the center o f stock pen #74* i f " std . p ip e, lin e conplete with a ll fitt in g s , lin .ft * 50 $ 5*33 $ 19.96 2" std . pipe, lin e complete with a ll fitt in g s , lin . f t . 180 7.40 27.71 3** std . pipe, lin e conplete with a l l fit t in g s , l i n . f t . 450 38.09 142.58 6* std . pipe, lin e conplete with a ll fittin g s , l i n . f t . 412 155*32 581.49 Interest during construction, 8.16 #986*04 (16)