Information
Digital ID
upr000212-076
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.5, Estimate of cost for constructing 8" C.I. pipe line "by Las Vegas Land and Water Go. Construct 8" C.I* pipe line from existing 16” main in the vicinity of First and Main Streets to the Land Company's Ranch, to convey irrigation water to the Ranch and incidentally furnish the miner’s inches per 24 hours of water we are required by contract to furnish to the Stewart Burial Plot: 5,160* of 8" C.I. pipe « $1,204 Contingencies v Labor Material Exp* Inr* 5 160* 6 398* 100*______192* TOTAL ITEM HO. 5 $5 260. $6 590* $11 850. Los Angeles, Califbrnia. May 4, 1940. Total $11 850.