Skip to main content

Search the Special Collections and Archives Portal

upr000095 82

Image

File
Download upr000095-082.tif (image/tiff; 26.42 MB)

Information

Digital ID

upr000095-082
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    (telephone dictation - Add the following to the end of Section 1 of the Agreement marked Exhibit "A":) K In the event the District shall fail to remove the pipe line - — , (h) referred to in sub-paragraph /L and jp of this Section 1, within the time above specified, Union Pacific shall have the right to remove said pipe line and to construct a new pipe line equivalent in capacity to the pipe line referred to ityParagraph jL of this Section 1, in location shown by Red line between points marked "S", "T", and "U"# on said Exhibit A-l, and to connect said pipe line into the facilities of the district so as to provide service through said new pipe line into the main extending along Bonanza Road, In the event the District shaj.1 fail to remove the wire lines GO Q) referred to in sub-paragraphs 1C andA) of this section within the period above-mentioned, the Union Pacific shall have the right to remove said wire lines and to construct or arrange with the Southern Nevada Power Company for the construction of new connections between the existing power facilities of the district and the power lines of the Southern Nevada Power Company so as to provide power for the operation of the water production facilities located upon the land shown tinted in Pink on Exhibit A-l. Union Pacific shall have the right to construct such facilities upon the property of the district as shall be necessary to qfl8Hn>mgjace said new pipe line and new power line connections into the existing facilities of the district. Upon the completion of said work, the district shall pay Union Pacific, within 30 days after rendition of bill therefor, the actual cost to Union Pacific and Southern Nevada Power Company of removing said pipe lines and wire lines and constructing said new pipe line and said new (OVER)