Skip to main content

Search the Special Collections and Archives Portal

upr000036 136

Image

File
Download upr000036-136.tif (image/tiff; 23.9 MB)

Information

Digital ID

upr000036-136
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    booster pimps, reservoirs, water treatment plant, ©to*, in­stalled at a oast in mmm of $0,000,000,00. At the meeting last night, the engineers advised the oooaaitiee that the Basie water •? atari had been subjected to oonsl&erabXo wear alcl tear, t besides being installed In a hurry as a war emergency measure, and that'they (the oaemlttee) AuxtiUI therefor© expect to be saddled with the entire cost of a line frost the Lobe* this statement was' .mad© in response to a rumor that the HatioiuA* downment might be persuaded to /Are the system to dark County without coot. The i34iaio Magnosliss water- line operating costa, in- ?' > eluding dost of Water Purchased (at tsdee), Supply and fransmiseion • Storage alii Treatment, was. $32*80 per million gallons. .Based on a mx&mm, demand of 14,000,000 gallons per day (vfoloh we ap­proached last summer) the oost would be #22,080.00 per month. Our sales now run $3.3,000,00 per month. The IM1 operating cost shows quoted doss not include depreciation, reserve for replace­ment, taxes »- interest on investment, and ooatCBplatss delivery only half-way to has Vegas. ?SJH> • The capacity of their water treatment plant is 20 Billion gallons per day, and 6 -million gallons por day of this amount mist be delivered to the present Basic Magnesium Project . and tbs tom of Henderson adjoining, fTahhly, X do not see what could be accomplished by the proposed plan, except that it might make a supply of water available for irrigation in the Vegas Valley (at the expense