Skip to main content

Search the Special Collections and Archives Portal

upr000103 168

Image

File
Download upr000103-168.tif (image/tiff; 26.75 MB)

Information

Digital ID

upr000103-168
Details

Rights

This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

Digital Provenance

Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

Publisher

University of Nevada, Las Vegas. Libraries

KELOCATIOM NORA PER ACKSagNT C.L.D, 11342 Description Remarks 5(e) Construct 39" pipe line between points i t Y and Y 4 I Under Spec. 1, Fiaber Contracting Co, Completed October 18, 1955* 5(b) Construct 24" pipe line between points K A E Under Spec, 1, Fisher Contracting Co, Completed October 18, 1955, 5(c) Construct 8” pipe line between points T A D Under Spec, 1, Fisher Contrasting Co, Completed October 18, 1955* 5(d) Relocate pump station froa point HH to point near R Removed under Spec. 1, Fisher Contracting Co. Abandoned and not re-installed at point R* Completed October 18, 1955, 5(e) Construct 14" pipe line between points 3, T and U . Under Spec, 1, Fisher Contrasting Co, Cmnpleted*. October 18, 1955. 5(f) Construct 6” pipe line between J A 00 (if not already constructed) Constructed prior to purchase. 5(g) Construct power line between points D A T and T A Y Mot necessary. 5(b) Besov* pipe line between points KK A LL Under Spec, 1, Fisher Contracting Co, Completed, - October 18, 1955 5 (i) Resttve pipe line between points H A JJ Under Spec, 1, Fisher Contracting Co, Completed,. October 18, 1955. 5(j) Remova power line between points AA A BB and FF A HH Removed by Southern Nevada Power C Complete December 1955, exsept tra former pole at old pwap sta, aita 50c) Robots power lines, telephone circuits and telemeter wires between points CC A GO Removed by Southern Nevada Power G Complete December 1955* 5(1) Remove pipe lines between points A A E, A A K. and R A HH All except line between R A N removed under Spec, 1, Fisher Contracting Co, Completed October 18 1955, Line from R to HH left in mi request of U, P,, subject to granting of suitable easement.