Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Information
Digital ID
Permalink
Details
More Info
Rights
Digital Provenance
Publisher
Transcription
KELOCATIOM NORA PER ACKSagNT C.L.D, 11342 Description Remarks 5(e) Construct 39" pipe line between points i t Y and Y 4 I Under Spec. 1, Fiaber Contracting Co, Completed October 18, 1955* 5(b) Construct 24" pipe line between points K A E Under Spec, 1, Fisher Contracting Co, Completed October 18, 1955, 5(c) Construct 8” pipe line between points T A D Under Spec, 1, Fisher Contrasting Co, Completed October 18, 1955* 5(d) Relocate pump station froa point HH to point near R Removed under Spec. 1, Fisher Contracting Co. Abandoned and not re-installed at point R* Completed October 18, 1955, 5(e) Construct 14" pipe line between points 3, T and U . Under Spec, 1, Fisher Contrasting Co, Cmnpleted*. October 18, 1955. 5(f) Construct 6” pipe line between J A 00 (if not already constructed) Constructed prior to purchase. 5(g) Construct power line between points D A T and T A Y Mot necessary. 5(b) Besov* pipe line between points KK A LL Under Spec, 1, Fisher Contracting Co, Completed, - October 18, 1955 5 (i) Resttve pipe line between points H A JJ Under Spec, 1, Fisher Contracting Co, Completed,. October 18, 1955. 5(j) Remova power line between points AA A BB and FF A HH Removed by Southern Nevada Power C Complete December 1955, exsept tra former pole at old pwap sta, aita 50c) Robots power lines, telephone circuits and telemeter wires between points CC A GO Removed by Southern Nevada Power G Complete December 1955* 5(1) Remove pipe lines between points A A E, A A K. and R A HH All except line between R A N removed under Spec, 1, Fisher Contracting Co, Completed October 18 1955, Line from R to HH left in mi request of U, P,, subject to granting of suitable easement.