Skip to main content

Search the Special Collections and Archives Portal

Search Results

Display    Results Per Page
Displaying results 593821 - 593830 of 618098

Warren A. Bechtel Album of Hoover Dam: photographic print

Date

1972-07-15

Description

Pg.93 #3467 Looking downstream from Nevada side, showing Boulder Dam, Spillways, Intake Towers, etc. Note general clean-up and road work; also, Intake Tower lanterns in place. Sept. 27, 1935. Pg.93 #3471 Looking upstream toward Nevada Spillway Drainage Flume, and general area. Sept. 27, 1935. Pg.93 #3464 Looking downstream toward Arizona Spillway. Note general road work, curbs in place and guard rails being installed. Sept. 26, 1935. Pg.93 #3465 From Arizona Spillway Gate House, looking upstream. Note float well supply line finished and construction on upstream abutment wall. Sept. 9, 1935

Warren A. Bechtel Album of Hoover Dam: photographic print

Date

1978-06-15

Description

Pg.75 #3293 View from the Nevada Utility Tower of Boulder Dam, showing the Memorial Day exercises in connection with the unveiling of the plaque commemorating the men who gave their lives in the construction of Boulder Dam. May 30, 1935. Pg.75 #3287 On crest of Boulder Dam, looking toward the Nevada side, showing final pour in the slot, which practically completes the concrete in Boulder Dam. May 29, 1935. Pg.75 #3298 View of Boulder Dam, from the Nevada side. The road, towers, and parapets are completed. June 1, 1935. Pg.75 #3282 Looking upstream at No.6 Intake Tower Top. Note the method of lowering the trash tracks into their respective slots. May 27, 1935.