Skip to main content

Search the Special Collections and Archives Portal

upr000280 179

Image

File
Download upr000280-179.tif (image/tiff; 27.18 MB)

Information

Digital ID

upr000280-179
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    V Sheet 3 Work Order No. Description of Fro.ject Expenditure made Year_103l_ Estimated Expenditure Year 1952_ 681 Water mains to serve Ridg'eview Tract No. 3 2 789.00 682 Water mains to serve Industrial Area between Imperial and Wyoming Sts. 5 570.00 684 Acquire existing 840 ft. of 6 inch steel water main in Edgewood Ave.serving Honrath Tract and construct 350 ft, water main extension thereto 980.38 1 659.62 685 Water mains to serve further de­velopment of Southridge Tract Addition 5 706.84 723.16 686 Water mains to serve 3rd unit of Columbia Heights Addition 6 460.00 688 Water mains to serve Tract No.3 of Paradise Village 6 210.00 Total 137_363^53.